Insightek.ai
Customer cases

Real deployments, anonymized results.

What shipped. How it was measured. What we could and could not publish.

Every case below is a real Insightek deployment on a manufacturing line. We believe the only useful case study is one where the test method and baseline are disclosed alongside the number — so we publish each one against that standard.

Most customers on this list are under NDA. Identifying details — company names, product descriptions, line layouts — have been anonymized or replaced with industry descriptors. Quantitative results are published only when the customer has approved the specific numbers; otherwise we publish qualitative outcomes and make the full figures available under mutual NDA during POC scoping.

Electronic equipment manufacturing Visual Inspection

Control-module assembly for electronic equipment

The senior inspector retired. Quality didn't. Visual Inspection AI Agent absorbed a decade of pattern recognition from OK samples — and now applies it to every part, every shift, with a per-unit audit trail.

Read the case →
Electronic manufacturing services Visual Inspection

Multi-model PCB inspection at an EMS factory

27 SKUs onboarded in 6 weeks — same camera fleet. An EMS line that used to spend weeks per BOM on template authoring switched to a single register-and-confirm flow. Vision engineering hours per new variant dropped to near zero.

Read the case →
OEM contract manufacturing Visual Inspection

Cylindrical-label integrity checking at an OEM

Customer audits stopped flagging label defects. An OEM that lost contracts over mislabeled cylindrical housings now ships every unit with image evidence of correct text, barcode, and serial — auditor-ready out of the box.

Read the case →
Precision electronics Action Compliance

Three-week rollout at a precision electronics line

The bottleneck nobody could timestamp, now has one. A precision electronics line ended two long-running pains — recurring missed-assembly batches and an unmeasurable bottleneck — in three weeks, using the cameras already mounted at each station.

Read the case →

Is your line the next case study?

Book a 30-minute engineering call. We will walk through your line, your constraints, and a realistic POC plan.